Melendudno

TAP transports first 1 bcm of natural gas to Europe

By
LYAMAN ZEYNALOVA

Following the commencement of gas flows via TAP in December 2020, the Trans Adriatic Pipeline AG announces that a total of 1 billion cubic meters (bcm) of natural gas from Azerbaijan has now entered Europe via the Greek interconnection point of Kipoi, where TAP connects to the Trans Anatolian Pipeline (TANAP), reports TAP AG.

Subscribe to Melendudno